Constructionline Gold · Building Safety Act – Higher-Risk Buildings certified
Home
Services
Cladding remediationRainscreen claddingInsulated render & EWIBrick slip systemsFire stopping & cavity barriersSFS & through-wallWall explorer
Building Safety Act
OverviewGateway trackerGolden ThreadRemediation checkerFAQs
Who we work with
Main contractorsHousing associationsBuilding owners & Accountable PersonsArchitects & cost consultants
About
About ProfacTeamHow we workAccreditationsCommunityCareers
ProjectsContact

Building envelope specialists · Manchester

Safer façades,built andsigned off.

Profac removes combustible cladding and installs rainscreen, insulated render and brick slip systems, with a complete Golden Thread from Gateway 2 to sign-off.

Principal Contractor experienceA1 non-combustible systemsDigital Golden Thread
Live remediation18m+ · Higher-risk building
Animated tower elevation showing combustible cladding being surveyed, stripped, replaced with A1 panels and signed offACM · Cat 3EPS insulationNo cavity barriers

Survey: combustible system found

PAS 9980 appraisal confirms ACM panels and EPS insulation. Remediation required.

96Panels at risk

Accredited & trusted by the industry

Constructionline GoldCHASSafeContractorSSIPAcclaimBenxSK Systems

Why Profac

Every layer installed right, and proven.

We work with main contractors, architects, cost consultants, housing associations, the Building Safety Regulator, building control and Homes England, so every project moves cleanly through its gateways to sign-off.

2018

Founded by Andy Gait

35yrs

Years’ façade experience leading our technical team

A1

Non-combustible systems specified as standard

£7m

Forecast turnover for 2026, grown organically

Wall explorer

Take a façade apart.

What makes a wall safe is mostly hidden. Rotate, explode and inspect the systems we install, and see the fire class of every layer.

Drag to rotate · click a layerOutside ↑

    Layer detail

    Select a layer

    Fire class—
    Typical depth—

    Pick any layer in the list or the 3D view to see what it does and how we install it.

    Herculaneum Quay, Liverpool

    Featured project · Liverpool

    Herculaneum Quay

    A tower that has never been lived in because of its combustible cladding. As Principal Contractor from Gateway 2 towards Gateway 3, we’re replacing the whole system with a BBA-approved, Class A fire-rated solution.

    Principal ContractorGateway 2 → 3Homes EnglandFull strip & replace
    Read the case study

    Building Safety Act

    Know exactly where your project stands.

    The Act brought gateways, dutyholders and the Golden Thread. Step through each stage to see who’s involved, what’s needed and what Profac takes off your plate.

    Use ← → to move between stages
    The Curve beforeThe Curve after During worksComplete

    The Curve · New build

    Curves leave nowhere to hide.

    Curved external wall insulation and through-coloured silicone render, detailed with the supplier and architect and installed to a tight tolerance. It cut heating costs for residents, too.

    • Curved EWI detailing developed with the manufacturer
    • Reinforced basecoat and silicone render finish
    • Delivered on programme and on budget
    View project

    How we work

    Survey to Golden Thread.

    A turnkey service covering specification, installation and quality management, with the paperwork done properly at every step.

    01

    Survey & review

    We visit, survey and review existing reports, from FRAEWs and intrusive investigations to drawings and the fire strategy.

    02

    Design & specification

    Our in-house designers work with manufacturers on a compliant, buildable system and the details that make it work.

    03

    Approvals

    We provide the evidence needed for building control and the Building Safety Regulator, and support Gateway 2.

    04

    Installation

    Accredited installation teams, a site manager on every job and a quality manager checking every stage.

    05

    Golden Thread handover

    A complete digital record of what was built, ready for Gateway 3 and the life of the building.

    Remediation checker

    Not sure where your building stands?

    Answer five quick questions about height, cladding and assessments. You’ll get a plain-English summary of the likely route and the next steps.

    Tendering?

    Send us the drawings.

    Our estimators price the whole through-wall build-up, itemised and transparent, with technical comments where the spec can be improved.

    From the MD

    “I kept seeing a gap for high-quality installation. Profac exists to fill it, on every elevation, on every floor.”

    AG
    Andy GaitManaging Director · 15+ years in EWI and cladding
    Profac site manager on a completed projectOn site · North West

    Start a conversation

    Safer façades. Signed off.

    Tell us about your building, programme or tender. You’ll speak to someone who knows the build-up, not a call centre.

    Concept design · not the official website