Constructionline Gold · Building Safety Act – Higher-Risk Buildings certified
Home
Services
Cladding remediationRainscreen claddingInsulated render & EWIBrick slip systemsFire stopping & cavity barriersSFS & through-wallWall explorer
Building Safety Act
OverviewGateway trackerGolden ThreadRemediation checkerFAQs
Who we work with
Main contractorsHousing associationsBuilding owners & Accountable PersonsArchitects & cost consultants
About
About ProfacTeamHow we workAccreditationsCommunityCareers
ProjectsContact

How we work

Survey to Golden Thread.

A turnkey service that covers every aspect of your cladding or render project, including specification, installation and quality management.

Design & specificationDesign & specification
01

Survey & review

We visit, survey and review existing reports, from FRAEWs and intrusive investigations to drawings and the fire strategy.

02

Design & specification

Our in-house designers work with manufacturers on a compliant, buildable system and the details that make it work.

03

Approvals

We provide the evidence needed for building control and the Building Safety Regulator, and support Gateway 2.

04

Installation

Accredited installation teams, a site manager on every job and a quality manager checking every stage.

05

Golden Thread handover

A complete digital record of what was built, ready for Gateway 3 and the life of the building.

Survey & review

Step 01

Survey & review

We start on site and in the paperwork: FRAEWs, intrusive investigations, drawings, the fire strategy and the existing substrate. Fixings are pull-out tested before we commit to a system.

Design & specification

Step 02

Design & specification

Our in-house designers work with system manufacturers on bracket layouts, wind load calculations and interface details, choosing systems that satisfy the fire strategy and the design intent.

Approvals

Step 03

Approvals

We supply product classifications, test evidence and competence statements for building control and Gateway 2 applications, and run change control once works begin.

Installation

Step 04

Installation

Accredited teams, a site manager on every project and a dedicated quality manager. Fire-critical details are inspected, photographed and signed off before cover-up.

Golden Thread handover

Step 05

Golden Thread handover

Records are captured as we go, not compiled at the end. At completion, the client receives a searchable digital record of the external wall as built.

Remediation checker

Not sure where your building stands?

Answer five quick questions about height, cladding and assessments. You’ll get a plain-English summary of the likely route and the next steps.

Tendering?

Send us the drawings.

Our estimators price the whole through-wall build-up, itemised and transparent, with technical comments where the spec can be improved.

Start a conversation

Safer façades. Signed off.

Tell us about your building, programme or tender. You’ll speak to someone who knows the build-up, not a call centre.