Constructionline Gold · Building Safety Act – Higher-Risk Buildings certified
Home
Services
Cladding remediationRainscreen claddingInsulated render & EWIBrick slip systemsFire stopping & cavity barriersSFS & through-wallWall explorer
Building Safety Act
OverviewGateway trackerGolden ThreadRemediation checkerFAQs
Who we work with
Main contractorsHousing associationsBuilding owners & Accountable PersonsArchitects & cost consultants
About
About ProfacTeamHow we workAccreditationsCommunityCareers
ProjectsContact

Remediation checker

Where does your building stand?

Five quick questions. A plain-English summary of the likely route, what to do next and how we can help. No sign-up, no personal details.

Next steps

Prefer to talk it through?

Call us on 01625 267931 or send the reports you have. We’ll tell you honestly what we think.

What is a higher-risk building?
Under the Building Safety Act, a higher-risk building in England is at least 18 metres tall or has at least seven storeys, and contains at least two residential units. Care homes and hospitals meeting the height threshold are also included during design and construction.
What is the Golden Thread of information?
It’s the accurate, up-to-date digital record of how a higher-risk building was designed, built and is maintained. It must be kept for the life of the building so anyone responsible for safety can find the information they need.
What is PAS 9980?
PAS 9980 is the code of practice for fire risk appraisal of external walls (FRAEW). It’s used to decide whether an existing wall presents a risk to life, and what action is needed.
What does an EWS1 form do?
An EWS1 form records an assessment of an external wall for valuation purposes. Lenders may ask for one before agreeing mortgages on flats in buildings with cladding.
What does A1 or A2-s1,d0 mean?
They’re fire reaction classifications under BS EN 13501-1. A1 is non-combustible; A2-s1,d0 has limited combustibility, low smoke and no flaming droplets. Relevant buildings over 18m must use materials of at least this standard in the external wall.

Start a conversation

Safer façades. Signed off.

Tell us about your building, programme or tender. You’ll speak to someone who knows the build-up, not a call centre.

Concept design · not the official website