Building Safety Act · Higher-risk buildings
Cladding remediation
We take combustible external walls off occupied and empty buildings and replace them with non-combustible systems, acting as Principal Contractor through Gateway 2 and Gateway 3.
Cladding remediationOverview
Remediation is about more than swapping panels. Every decision needs to stand up to the Building Safety Regulator, building control, the fire engineer and the funder, and it needs to be recorded so it can be checked years from now.
Profac plans the strip-out, temporary weather protection and replacement sequence around residents, then installs A1 or A2-s1,d0 systems with fire stopping and cavity barriers verified at every floor. The whole process is captured in a digital Golden Thread that’s handed over at sign-off.
WHO IT’S FOR
What’s included
Everything the wall needs.
- Review of FRAEW / PAS 9980 findings and the remediation specification
- Principal Contractor and Principal Designer coordination
- Gateway 2 submissions support and change control
- Safe removal of ACM, HPL, combustible insulation and render
- A1 / A2-s1,d0 replacement rainscreen, render or brick slip systems
- Cavity barriers, fire stopping and compartmentation
- Photographic, floor-by-floor installation records
- Golden Thread handover and Gateway 3 completion support
The build-up
Inspect it layer by layer.
Layer detail
Select a layer
Pick any layer in the list or the 3D view to see what it does and how we install it.
FAQs