Regulation built around accountabilityThe essentials
Four ideas behind the Act.
The Building Safety Act was introduced to change how higher-risk buildings are designed, built and managed, with clear accountability at every stage.
Higher-risk buildings
At least 18m or seven storeys, with two or more residential units. These buildings fall under the Building Safety Regulator for design, construction and occupation.
Dutyholders
Client, Principal Designer and Principal Contractor each carry legal duties to plan, manage and monitor work so it complies. Competence has to be demonstrated, not assumed.
The Golden Thread
A digital, accurate and up-to-date record of how the building was designed and built, kept for its whole life and available to those who need it.
Combustible materials
Relevant buildings over 18m must use A1 or A2-s1,d0 materials in the external wall. Combustible cladding on existing buildings is assessed under PAS 9980.
Gateway tracker
From planning to occupation.
Choose new build or remediation, then step through each stage.
Principal Contractor · Herculaneum QuayOur role
A contractor dutyholder that takes it seriously.
As a Principal Contractor and installer, we plan, manage and monitor our work so that it complies with the Building Regulations, and we control building safety risks through every phase.
We’re Constructionline Gold accredited with certification in Building Safety Act – Higher-Risk Buildings, and SafeContractor approved. More importantly, we build the evidence trail as we go.
- Competence evidenced for Gateway 2 applications
- Change control on every element of our package
- Fire-critical details photographed and signed off by an appointed person
- A complete Golden Thread handed over for Gateway 3
Jargon buster
Straight answers.
The terms you’ll hear on every remediation project, explained simply.
What is a higher-risk building?
What is the Golden Thread of information?
What is PAS 9980?
What does an EWS1 form do?
What does A1 or A2-s1,d0 mean?
Remediation checker
Not sure where your building stands?
Answer five quick questions about height, cladding and assessments. You’ll get a plain-English summary of the likely route and the next steps.
Tendering?
Send us the drawings.
Our estimators price the whole through-wall build-up, itemised and transparent, with technical comments where the spec can be improved.